Catalogo Articoli (Spogli Riviste)

OPAC HELP

Titolo:
FUEL RESOURCE SCHEDULING WITH EMISSION CONSTRAINTS
Autore:
VICKERS VL; HOBBS WJ; VEMURI S; TODD DL;
Indirizzi:
HARRIS CORP MELBOURNE FL 32901 BIG RIVERS ELECT CORP,AIR QUAL HENDERSON KY 00000
Titolo Testata:
IEEE transactions on power systems
fascicolo: 3, volume: 9, anno: 1994,
pagine: 1531 - 1538
SICI:
0885-8950(1994)9:3<1531:FRSWEC>2.0.ZU;2-0
Fonte:
ISI
Lingua:
ENG
Keywords:
ANNUAL RESOURCE SCHEDULING; EMISSIONS CONTROL; ALLOWANCE MARKETING; DESULFURIZATION STRATEGIES; FUEL CONTRACT PLANNING;
Tipo documento:
Article
Natura:
Periodico
Settore Disciplinare:
Science Citation Index Expanded
Citazioni:
3
Recensione:
Indirizzi per estratti:
Citazione:
V.L. Vickers et al., "FUEL RESOURCE SCHEDULING WITH EMISSION CONSTRAINTS", IEEE transactions on power systems, 9(3), 1994, pp. 1531-1538

Abstract

With the passage of the Clean Air Act Amendments of 1990, electric utilities in the United States are faced with a two-phased program for emissions control. The particular emphasis on sulfur dioxide (SO2) willrequire utilities to limit emissions to a specific number of tons peryear allocated to the generating units in that utility. The first phase takes effect in January 1995, and includes only the largest SO2 emitters. Phase 2 begins in January 2000, and will cover virtually all power plants. The constraints on emissions will be implemented by an allowance program: an allowance represents one ton of SO2 discharged intothe atmosphere. The number of allowances consumed in one year must not exceed the number owned by that utility. Utilities will receive allowances from the EPA each year, and they can obtain allowances from a third-party source. Any leftover allowances may be held for future use. In light of these new environmental protection requirements, a new look must be taken at utility operating practices and, therefore, at thesoftware tools used to implement those practices. This paper addresses the operating concerns of one coal-burning utility, Big Rivers Electric Corporation, including fuel contract planning and unit dispatchinggiven fuel and SO2 emissions constraints.

ASDD Area Sistemi Dipartimentali e Documentali, Università di Bologna, Catalogo delle riviste ed altri periodici
Documento generato il 25/11/20 alle ore 15:37:42