Catalogo Articoli (Spogli Riviste)

OPAC HELP

Titolo:
DUE-DATE BASED LOADING AND SCHEDULING METHODS FOR A FLEXIBLE MANUFACTURING SYSTEM WITH AN AUTOMATIC TOOL TRANSPORTER
Autore:
ROH HK; KIM YD;
Indirizzi:
KOREA ADV INST SCI & TECHNOL,DEPT IND ENGN,YUSONG GU TAEJON 305701 SOUTH KOREA KOREA ADV INST SCI & TECHNOL,DEPT IND ENGN,YUSONG GU TAEJON 305701 SOUTH KOREA SAMSUNG SDS,SOFTWARE DEV TEAM,GWANAK GU SEOUL 151742 SOUTH KOREA
Titolo Testata:
International Journal of Production Research
fascicolo: 11, volume: 35, anno: 1997,
pagine: 2989 - 3003
SICI:
0020-7543(1997)35:11<2989:DBLASM>2.0.ZU;2-1
Fonte:
ISI
Lingua:
ENG
Soggetto:
TARDINESS PROBLEM; FMS;
Tipo documento:
Article
Natura:
Periodico
Settore Disciplinare:
Science Citation Index Expanded
Science Citation Index Expanded
Citazioni:
33
Recensione:
Indirizzi per estratti:
Citazione:
H.K. Roh e Y.D. Kim, "DUE-DATE BASED LOADING AND SCHEDULING METHODS FOR A FLEXIBLE MANUFACTURING SYSTEM WITH AN AUTOMATIC TOOL TRANSPORTER", International Journal of Production Research, 35(11), 1997, pp. 2989-3003

Abstract

We consider the loading and scheduling problems in flexible :manufacturing systems (FMSs) in which each part visits only one machine for its entire processing In this type of FMS, if required tools are not loaded on the tool magazine of a machine, they can be transferred from other machines or a tool crib. For the efficient operation of such systems, loading and scheduling of parts and tools should be done carefully. This paper focuses on the problems of part loading, tool loading, and part sequencing with the objective of minimizing the total tardiness. We suggest three heuristic approaches, called list scheduling, sequential, and iterative approaches. In the list scheduling approach, loading plans of parts and tools and schedules are determined simultaneously according to part priorities. In the sequential approach, a parallel machine scheduling problem is solved to determine the loading plan and the sequence of parts, and then the tool loading problem is solved using the part loading plan. With methods similar to those used in thesequential approach, the part loading and sequencing problem and toolloading problem are solved iteratively in the iterative approach. Results of computational tests on randomly generated problems show that the iterative approach performs better than the others.

ASDD Area Sistemi Dipartimentali e Documentali, Università di Bologna, Catalogo delle riviste ed altri periodici
Documento generato il 25/01/20 alle ore 19:10:07